Boma International

Five Points You Need to Pay Attention to While Installing a Sink

2021-11-29 10:15:14
Firstly, leave enough space on the counter. The space should be consistent with the volume of the sink. You need to figure out what the size of the sink you have purchased is before installation in case of reworking. What's more, it's recommended that you shouldn't start to install the sink until the whole kitchen is decorated.

Secondly, make sure it's firm enough in the joint part while connecting the outlet pipe on the faucet to the inlet switch. Any seams, no matter how thin they are, may cause big trouble in the future. Meanwhile, don't mistake the position of the cold and hot pipe. 
 
Thirdly, don't forget to conduct a drainage test. Fill the sink with water, test the drainage of the filter basket and overflow hole. You should rework it immediately if water seepage is found.  

Fourthly, install hanging pieces between the sink and the counter. This is to avoid the shaking of the sink caused by small gaps.
 
Finally, ensure that the joint gap between the sink and the counter is uniform when sealing the edge with silica gel. 

Hot Tag:

Guide for sink installers

Get a free guide and expand your business!

Want to know more about our products? Tell us a little bit about what you're looking to know or how we could help you, and the best way to get in contact with you. We'll get in touch within one bussiness day.

Your Name * (required)

Your Email * (required)

Phone

Content * (required)

factory,manufacturer,supplier

Bomasink

email
Email
contact us
Contact Us
Chat
top
Top
Copyright © Boma International All Rights Reserved.
Clicky